| S.NO |
DESCRIPTION |
UNITS |
DETAILS |
| 1 |
Flyover |
Nos |
2 |
| 2 |
VUP |
Nos |
9 |
| 3 |
LVUP |
Nos |
3 |
| 4 |
SVUP |
Nos |
1 |
| 5 |
VOP |
Nos |
3 |
| 6 |
Box Culverts |
|
|
| I. |
Reconstruction of Box Culverts |
Nos |
39 |
| II. |
Culverts to be dismantled |
Nos |
4 |
| III. |
New Consturction |
Nos |
23 |
| VI. |
Cross Road Culverts |
Nos |
59 |
| 7 |
Detais of New Construction Bridges |
|
|
| I. |
New construction of Major Bridges |
Nos |
4 |
| II. |
New Construction of Minor Bridges |
Nos |
3 |
| 8 |
Viaduct/Elevated Corridor |
Nos |
2 |
| 9 |
New RUB /RUB |
No |
1 |
| 10 |
Over Head Signs |
No |
29.000 |
| 11 |
Minimum Length of Street Lighting |
kms |
26.860 |
| 12 |
Soil Nailing |
kms |
2.520 |
| 13 |
Minimum length of RCC Lined Drain |
kms |
64.700 |
| 14 |
Toll Plaza |
Nos |
Nill |
| 15 |
Truck Lay Bye |
Nos |
2 |
| 16 |
Bus Bays with Bus Shelter |
Nos |
30 |
| 17 |
Rest Areas |
Nos |
2 |